Skip navigation Ski resorts Renewable energy Underground engineering, road and railroad infrastructure design Structural calculation Safety coordination Studies, due diligences, project validations
Infrastructure and soil nailing in the residential development area "Endereck" - Meransen Customer Association Endereck - Meranza Global construction costs ca. 250.000,00€ High of the soil nailing over 20m Description 20m high soil nailing wall in geological critic terrain executed as a permanent intervention